Renovation changes

How should you record a renovation change?

Keep renovation changes clear with a written record of revised scope, materials, price and timing, plus a separate check of any permit requirements.

Published Oct 27, 2026 · Updated Oct 27, 2026

What should you do when the proposed work changes?

  1. 1Give the proposed change a reference and compare it with the current agreed scope.
  2. 2Ask for a written description of additions, removals, exclusions, price basis and schedule effects.
  3. 3Assign who checks building and trade permit implications; record the result separately from your decision.
  4. 4Follow your contract’s approval process, keep the accepted version and share it with affected trades.

What is different about a change record and a new quote?

A quote helps you decide which contractor and scope to accept before the job starts. A change record answers a narrower question during the job: what is different from the version already agreed? Start by identifying that baseline. Keep the contract date, relevant room, drawing version and original specification beside the proposed alteration. Someone who was not at the conversation should be able to understand the difference without guessing which earlier email still applies.

The federal Office of Consumer Affairs recommends clearly amending the original contract when extra work is added. The Canadian Home Builders’ Association also recommends documenting changes in work, price and schedule. This guide offers a way to organize that conversation, not a replacement contract or a legal opinion about who must pay. A record does not establish that a charge is justified, resolve a defect or authorize regulated work. Get appropriate advice if the disagreement concerns responsibility or contract rights.

  • Connect the revised drawing or product specification to the existing contract and keep the attachments together.
  • Record proposed changes to price and schedule alongside the work description, rather than leaving them in separate conversations.
Colour swatches and surface material samples beside a renovation drawing
Keep drawings and finish selections together when recording a proposed change.Photo by Pixabay on Pexels

What should the written change record contain?

Use one reference for each decision, such as CR-01, and retain both the proposal and the accepted version. Put the location and reason first, then separate work being added from work being removed. Describe the relevant material or finish precisely enough to distinguish it from the original choice. Avoid a note that says only “upgrade bathroom” because it leaves the actual boundary unclear. Attach a marked photo or drawing when that makes the intended difference easier to understand.

Next, record the proposed price basis, any credit, applicable tax treatment as stated by the contractor, timing effects, and unresolved questions. Do not convert an estimate or an allowance into a fixed price yourself. Ask the contractor to identify the basis in their own proposal. The federal contract guidance identifies scope, responsibility, cost, materials, dates and permits as useful contract information; keeping the corresponding change details together makes the new proposal easier to compare with that baseline.

  • Reference, date, property and affected room or work area.
  • Original item or drawing, proposed replacement, additions, removals and exclusions.
  • Contractor’s price basis, credits and timing proposal, with unknowns still marked unknown.
  • Permit-check owner, decision status, approval record and location of supporting attachments.

Which approvals need a separate check?

A homeowner’s agreement with a contractor and permission from a building or trade authority answer different questions. Your change record should identify who will check whether the revised scope affects an existing permit, approved drawings or inspection arrangements. Give that person the original approved information and a clear description of the proposed difference. Ask them to record the authority contacted, its response, the date and any outstanding submission. Do not mark the permit question settled simply because the price has been accepted.

Permit processes depend on the location and type of work. The federal renovation guidance identifies responsibility for permits as something to clarify in the contract; the Canadian Home Builders’ Association also treats permits and inspections as part of project planning. Use the current guidance from the authority responsible for your property, rather than copying a form from another municipality. If the change affects regulated electrical, plumbing or gas work, ask the responsible contractor which authority and approval process apply. Keep those responses separate from the owner’s product selection and the contractor’s scope agreement.

What does a useful change record look like in practice?

The following is an invented organizational example, not a real project, price quote or legal form. Suppose an owner asks to replace the originally specified kitchen cabinet handles with another model before installation. The record should distinguish the product selection from any consequences for ordering, existing holes, returns and labour. It should not assume the substitution has no cost simply because both choices are handles. It should also leave any unresolved responsibility visible rather than presenting a proposal as an agreement.

Example CR-01: Location: kitchen cabinet doors. Baseline: handle model recorded in the accepted finish schedule. Proposed difference: substitute the owner-selected model identified in an attached product sheet. Contractor to confirm: compatibility, order status, any return charge, installation impact, net price proposal and timing. Excluded: other cabinet or drawer alterations unless separately described. Approval status: proposed, awaiting the required decisions. Permit check: assigned to the project lead; outcome to be recorded after review. Keep the request in proposed status until the applicable approval process has been completed.

Use this as a prompt for a discussion, not permission to start. The original value comes from making pending answers visible in one place: what product is intended, what consequences the contractor has confirmed, what remains outside the change, and which decisions are outstanding. Replace the invented details with your own project information and retain the attachments alongside the record.

How do you keep the accepted change clear for everyone?

After the required decisions are recorded, save a dated accepted copy and connect it to the original contract file. Keep earlier drafts clearly marked as superseded instead of deleting the history or letting several versions circulate as current. Share the accepted scope with the people whose work it affects through the project’s agreed communication route. If one contractor coordinates several trades, confirm that responsibility instead of assuming each person has read an owner’s separate message.

At handover, compare the delivered item with the accepted description and record any open question without rewriting the earlier approval. Keep invoices, relevant drawings, correspondence and permit responses in the same project folder. These filing suggestions are an organizational method, not a ruling about acceptance, warranty, payment or dispute rights. If you still need a contractor, browse the relevant TradeList public profiles, describe the changed scope clearly and confirm fit directly. A directory listing does not establish licensing, availability or workmanship.

What else should you check before agreeing to a change?

Can I use an email instead of a change-order form?

Use the approval method required by your actual contract and the parties responsible for the project. An email can preserve a discussion, but this guide cannot determine whether a particular message satisfies your agreement. Keep the exact scope, attachments, decision and accepted version identifiable rather than relying on a vague reply.

Should I mark a change approved while its price is still unknown?

Keep unresolved points explicit and ask the contractor to explain how the proposed work would be priced and authorized under your agreement. A blank amount should not look like a zero-cost promise. Do not let a planning record silently convert an unresolved proposal into an agreed fixed-price item.

Does a contractor’s approval settle the permit requirements?

Treat these as separate questions. Confirm who is responsible for checking the revised work with the authority serving your property, and retain that response alongside the contractor’s proposal. An agreed product, price or schedule does not by itself show that a permit or inspection requirement has been addressed.

What if the change affects another trade’s work?

Identify the affected work in the proposed change and ask the project coordinator to confirm who needs the revised specification. A cabinet, wall or fixture decision can create questions for another contractor. Keep coordination, pricing and any permit checks visible before treating the proposal as ready to proceed.