Scope line items
Require written inclusions and exclusions for demolition, rough-in, finishes, cleanup, and disposal.
General contractor homeowner tool
Use this before hiring a GC for a multi-trade project. It helps you collect the same assumptions from each contractor so the lowest number is not hiding missing scope, allowances, permits, or coordination work.
Last updated Jul 11, 2026.
GC quote prep
General contractors can include different assumptions for permits, demolition, disposal, site protection, materials, allowances, subcontractors, schedule, and cleanup. This tool helps expose those assumptions before you compare prices.
The output is quote prep, not a permit ruling, engineering decision, health assessment, or final scope. Confirm technical and legal requirements with the relevant authority and qualified professionals before work starts.
These are the assumptions most likely to make two quotes look similar while covering different work.
Require written inclusions and exclusions for demolition, rough-in, finishes, cleanup, and disposal.
Ask about start date, lead times, inspections, owner decisions, and what can delay the project.
Clarify who applies, who pays, who books inspections, and what happens if revisions are required.
Cabinets, tile, fixtures, flooring, hardware, lighting, and appliances should have realistic allowance numbers.
Normalize scope first. Compare the same drawings, included trades, permits, allowances, exclusions, warranty, schedule, site protection, cleanup, and change-order process.
An allowance is a placeholder amount for a selection such as tile, cabinets, fixtures, or flooring. Low allowances can make a quote look cheaper before real selections are made.
Many GCs coordinate permit steps, but responsibility should be written down. Ask who applies, who pays, who books inspections, and what is excluded.