Deficiency list
Separate visible finish defects from incomplete work, seasonal exterior items, and owner preference changes.
Home builder homeowner tool
Use this checklist near completion or before possession. It helps you separate visible deficiencies from warranty documents, manuals, inspection records, keys, service contacts, and seasonal items that may need follow-up.
Last updated Jul 11, 2026.
Completion prep
A handover is more than keys. Homeowners should leave with warranty contacts, equipment manuals, inspection records, deficiency notes, maintenance expectations, and clarity on what will be completed after possession.
The output is quote prep, not a permit ruling, engineering decision, health assessment, or final scope. Confirm technical and legal requirements with the relevant authority and qualified professionals before work starts.
These are the assumptions most likely to make two quotes look similar while covering different work.
Separate visible finish defects from incomplete work, seasonal exterior items, and owner preference changes.
Collect warranty contacts, permit or inspection records, manuals, paint colours, and fixture information.
Landscaping, exterior touch-ups, grading, and weather-dependent work may need dated follow-up notes.
Ask for shutoffs, filters, panels, equipment, drains, alarms, irrigation, and maintenance responsibilities.
No. A handover checklist organizes documents, visible deficiencies, and follow-up questions. Warranty rights and claim timing depend on your contract and applicable BC warranty rules.
Photograph visible deficiencies, equipment labels, shutoffs, attic or crawl access points, exterior grading, concrete, decks, paint issues, and any item the builder agrees to correct later.
Yes. Equipment manuals, model numbers, filters, maintenance intervals, warranty contacts, and paint or finish details make future service easier.